Application Example: "Power Generation Equipment"
At the thermal power plant, after being lifted by a gantry hydraulic lifter, it was moved horizontally for 70 meters.
At the thermal power plant, wire clamps (strand jacks) were used to lift the turbines up to a height of 14 meters, followed by a horizontal movement of 70 meters using a gantry hydraulic lifter. The first commercial offshore wind turbine is equipped with the Enerpac synchronized lifting system. The Enerpac system automatically adjusts the yoke installed on the tripod foundation where the pile foundation has been driven. This system performs precise positioning and maintains a level position at all times. As a result, the turbine mast was constructed quickly and efficiently. [Contents] - TS Power Plant - Bird Offshore Wind Turbine (Offshore Wind Farm) For more details, please contact us or download the catalog.
- Company:エナパック 本社 営業部
- Price:Other